Old Golden House / Mutabile Arquitetura

IMG 0796 Sofia Vasconcelos 2Dg4fn

Located on a steep slope in Nova Lima, Minas Gerais, Casa Ouro Velho folds and opens across multiple levels, establishing a continuous and respectful dialogue with the natural landscape and the exuberance of the Atlantic Forest. Designed as a direct response to the topography and surrounding forest, the project is organized into levels that embrace the terrain, establishing a continuous dialogue between architecture and nature, with precise cuts that ensure the preservation of the larger native trees on the lot.

Gadi House / PMA madhushala

01 JNrA21

Dream – Carrying forward the honor and lineage of a family of Maratha sardars, the present heirs, the two brothers wanted to build a new house for their family. For their honor and societal standing they wished for an ornament of pride, standing strong in their ancestral grounds, beyond the crowds of the city, and secure as a fortress. Since generations they have been living in the traditional ‘Wadas’ and have developed a lifestyle of a similar understanding of a protected envelop, internal courts, large external open areas and farming. Accordingly, they wanted an architectural manifestation on a 1.2 acre of land, for their collective family to create an inward environment which will be independent and self-sustain its existence.

Cafe Zest / VAHID JOUDI STUDIO [Architecture + Design + Construction]

Zest Cafe Photo by Vahid Joudi 51 d2li7U

The Zest Café project was defined within the seasonal villa context of Karimabad, Shahsavar; a neighborhood that, due to the transient presence of residents and lack of integration with daily urban life, has remained devoid of vitality, and existing cafés have failed to become sustainable social hubs. The client’s request was the revitalization of an abandoned rental villa and its transformation into a public, youth-oriented space.

Cultural Center Simone Veil / Doucerain Lièvre Delziani Architectes

ACV PHO 06 min k9Jo6T

The new Simone Veil cultural centre is being built in the town centre, in an existing building (the Maison Hirsch), whose capacity will have to be increased by the construction of an extension. Located on Place Velotte, in the historic heart of the town centre and just a stone’s throw from the station, the Maison Hirsch and its garden represent an important part of the town’s heritage, a place of remembrance and a highly visible landmark.

SAFE Credit Union Performing Art Center / DLR Group

safe credit union performing art center dlr group 17 Ndhw5E

Opened in 1976, the SAFE Credit Union Performing Arts Center was a professional performing arts center in dire need of transformation. The aging brutalist structure stood closed off from view and separated from the surrounding urban fabric. With aging infrastructure, the building needed a comprehensive modernization to meet the escalating requirements of contemporary performance and to present a new face to the public.

OngAng 3D Concrete Printing Bridge

ongang 3d concrete printing bridge 23 VPnLXI

The Ong Ang Canal Bridge transforms a historic waterway into a piece of contemporary urban infrastructure that connects heritage and innovation. Flowing through the historic core of Bangkok, the Ong Ang Canal once served as the city’s defensive moat and later became a thriving artery of trade and daily life. Over centuries, this waterway has shaped the rhythm of the communities along its banks. The new pedestrian bridge reinterprets that living heritage through the language of water itself, capturing the canal’s continuous motion in architectural form.

The Story of Miyashita Park: Resistance, Partnership, and Publicness

the story of miyashita park resistance partnership and publicness 27 rK3QSL

Urban renewal is inherently fraught—financially complex, politically exposed, stakeholder-dense, and almost guaranteed to leave someone dissatisfied. Precisely for these reasons, many cities default to inertia rather than risk the upheaval that comes with reworking entrenched urban fabrics, their residences, and their dynamics; once the “sleeping bear” is prodded, unexpected complications tend to multiply.